LR4NX-FA Operator Manual
SATO

MENU

How to Search

MENU

  • TOP (Table of Contents)
  • Getting Started
  • Searching from Category
  • Searching by Function Names
  • Searching According to What You Want to Do
  • Troubleshooting
  • Support and Warranty
Close
TOP > Adjusting the Product > Workflow for Application Operations > Operation 5: Pressure Jet (PJ) Method Application (Print and Wait)
Operation 5: Pressure Jet (PJ) Method Application (Print and Wait)
Operation
The label that is delivered is held on the suction plate that is attached to the end of the cylinder (diagram 2). When the package stops, the [Activate Apply] signal (input) turns on, and after the application time passes, the cylinder extends and presses (blows) the label on (diagram 3).
After the pressure bonding time passes, the cylinder returns (diagram 4).
PJ method: Print and wait
 
•
After pressing the label on, and after the cylinder returns, the backward end sensor turns on, and then the product waits 200 ms until printing starts.

Back to top

© 2018 SATO Corporation