TOP > Adjusting the Product > Workflow for Application Operations > Operation 1: Cylinder Jet (CJ) Method Application (Print and Wait/Wait at Front End) Operation 1: Cylinder Jet (CJ) Method Application (Print and Wait/Wait at Front End) Operation The label that is delivered is held on the suction plate that is attached to the end of the cylinder (diagram 2). The cylinder extends to its forward end (diagram 3). The [Activate Apply] signal (input) turns on. And then, after the application time passes, the air blows the label on (diagram 4). After the blowing time passes, the cylinder returns (diagram 5). CJ method: Print and wait/wait at front end • After blowing the label on, and after the cylinder returns, the backward end sensor turns on, and then the product waits 100 ms until printing starts. Back to top